PROJECT |
STATUS |
CLIENT |
GALLERY |
1 |
Design, Supply and Install Fire Water Storage Tank
Manpower: 25
Job Duration: 90 days
Nature of Job: Project
Job involves design, supply, fabricate, paint and install one No. Fire Water Storage Carbon steel Tank.
|
Completed |
AMIC / TOHO (CRYSTAL YANBU) |
|
2 |
Valve Replacement – Solvey TurnAround
Manpower: 30
Job Duration: 21 days
Nature of Job : Turn Around
Job involves removal of Valves of sizes from 36” to 4” and reinstall the same after overhauling and calibration. Critical rigging is involved in this replacement due to less space for rigging.
|
Completed |
SADARA Petrochemicals |
|
3 |
Design, Supply and Install CANOPY Structures at NEOM Village
Manpower: 20
Job Duration : 90 days
Nature of Job: Project / Construction
Job involves design, fabrication and installation of CANOPY structures in 4 different locations including construction of civil foundation.
|
Completed |
NEOM |
|
4 |
Design, Supply and Install Space Frame Structures
Manpower: 20
Job duration : 12 months
Nature of Job: Project / Construction
Job involves design, supply, fabrication and Installation of Space Frame Structures in schools and petro station in Riyadh.
|
Completed |
Al Arab Contracting Company |
|
5 |
Modification Works in Petrochemicals Conversion Company
Manpower: 30
Job Duration: 90 days
Nature of Job: Project / Construction
Job Involves design, supply, fabricate and install Carbon Steel chilled water piping (4” to ¾”) for the new Injection Molding Machines including cold insulation. Also involves supply and installation of blower and scrap duct system fabricated from Stainless Steel Materials.
|
Completed |
Petrochemicals Conversion Co. (PCC) |
|
6 |
Design, Supply and Installation of Space Frame Structure
Manpower: 20
Job Duration : 18 months
Nature of Job: Project
Job involves design, supply, fabrication and Installation of Space Frame Structures in schools in Royal Commission Jubail.
|
Completed |
Royal Commission Jubail |
|
7 |
Design, Supply and Installation of Space Frame Structure
Manpower: 20
Job Duration: 18 months
Nature of Job: Project
Job involves the design, supply, fabrication, and Installation of Space Frame Structures in schools in Royal Commission Jubail.
|
Completed |
Royal Commission Jubail |
|
8 |
Valve Replacement in Advanced Petrochemicals
Manpower: 40
Job Duration: 15 days
Nature of Job: Turn Around
Job involves replacement of damaged pipe spools and Valves. Old valves are sent to overhauling shop and reinstalled after testing and calibration. Total no. of Valves (different sizes and Types) is 176.
|
Completed |
Advanced Petrochemicals |
|
9 |
Fabrication and Replacement of Piping Work in Finishing Mill and Cold Box Area at HADEED.
Manpower: 15
Job Duration: One Year
Nature of Job: Plant Turn Around (Once in three months – 7 days)
Job involves replacement of existing carbon steel piping of various diameter from 12” to 2” in different location. New Pipe spools are fabricated, painted and kept ready prior to shutdown.
|
Completed |
SABIC, HADEED |
|
10 |
Replacement of Lining work in Dehydration in column C -1402 and C 1403
Manpower: 50
Job Duration : 18 days
Nature of Job: Turn Around
Job involves removal of Carbon steel liner plates from the existing columns, fabrication of 3 mm thick Stainless Steel 316 grade liner plates, blast clean the existing columns after removal of carbon steel plates, fix and weld new SS liner plates.
|
Completed |
SABIC, SHARQ |
|